High quality smc bmc composite manhole cover plastic/composite resin manhole cover

  • >=200 Pieces
    $20.00
Model Number:
Customized Size
Lead Time:
Quantity(Pieces) 1 - 5000 >5000
Est. Time(days) 30 Negotiable
Contact Supplier
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Hebei, China (Mainland)
Brand Name:
OEM
Product name:
High quality smc bmc composite manhole cover plastic/composite resin
Material:
BMC
Color:
Green
Application:
Road Facilities
Usage:
Parking Safety
Size:
Customized Size
Weight:
Half Weight
Feature:
High Visible
Certificate:
ISO9001:2008
Keywords:
composite manhole cover
Supply Ability
Supply Ability:
300 Metric Ton/Metric Tons per Month
Packaging & Delivery
Packaging Details
PLYWOOD PALLET
Port
XINGANG,TIANJIN
Lead Time :
Quantity(Pieces) 1 - 5000 >5000
Est. Time(days) 30 To be negotiated
Product Description

Product Name: High quality smc bmc composite manhole cover plastic/composite resin manhole cover
1. Standard: ISO9001:2008, EN124
2. Material: BMC/SMC
3. Design: EN124 D400
4. Surface treatment: black paint, black bitumen paint

Product Name
High quality smc bmc composite manhole cover plastic/composite resin manhole cover
Material
BMC/SMC
Color
Green,Black, or as your requirements
Standard
ISO9001:2008, DIN EN124 
Design
a) EN124 A15, B125, C250, D400, E600 and F900
b) A60005 for casting design
c) Major standards designs available
d) As per customers' drawings or samples
Process
a) Molding boards
b) Green sand with hand molding 
Coating
a) Cold applied black bitumen
b) Without coating
c) Coating as per customers' requirement 
Application
building industry machinery
Products Show
Our Service

High quality

Passed the ISO9001:2008 quality system authentication and ROHS authentication.

High quality

Passed the ISO9001:2008 quality system authentication and ROHS authentication.

High quality

Passed the ISO9001:2008 quality system authentication and ROHS authentication.

Our Company

Factory

Our Factory

Workshop

Our Workshop

Warehouse

Our Warehouse

Team

Our Team

Packing & Delivery

Packing Details  : Packing with wooden pallets or cartons

Delivery Details : 15-30 days after mould confirmed

Our Certifications
Customer Photo

Our general Manager was interviewed by CCTV

Our general manager Mrs. Lilian Zhang was interviewed by CCTV in the 2015 spring fair in the Canton Fair, our company was the pioneer of Alibaba Trade Assurance and Lilian speak: Trade ssurance gurantee our quality for you, welcome cooperation!

Our Customer was interviewed by CCTV

Hebei LANWEI company is our best supplier for 8 years and we will continue good cooperation, we like her high quallity, good service and timely delivery, sepcail we had good communication, not only business, but also friendship, we are expecting long term cooperation!"

Customer Wall

There is a customer photos wall in our office, and we record our all cooperated customers from different countries, they are more like our family people than like our customers.

Our aim is to be the best supplier for the pipeline products, connect the world, trade the word.

FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like